Menu
Your Cart

BURNiT

Wood Boiler for Central Heating BURNiT NWB PRIME 90, 90kW - BURNiT Wood Boiler for Central Heating BURNiT NWB PRIME 90, 90kW - BURNiT
Last item in stock FREE DELIVERY
Brand: BURNiT Model: 0000000063
Steel boiler with intelligent electronic controller and electric fan for forced air feed. Solid fuel boilers NWB PRIME range in nominal output from 20 to 110 kW to satisfy the heating demands of medium to large sized spaces. They are engineered for burning solid fuel - wood, wood briquettes class B ..
€ 4,512.55
Ex Tax:€ 3,668.74
Wood Boiler for Central Heating BURNiT NWB PRIME 30, 30kW - BURNiT Wood Boiler for Central Heating BURNiT NWB PRIME 30, 30kW - BURNiT
Last item in stock FREE DELIVERY
Brand: BURNiT Model: 0000000040
Steel boiler with intelligent electronic controller and electric fan for forced air feed. Solid fuel boilers NWB PRIME range in nominal output from 20 to 110 kW to satisfy the heating demands of medium to large sized spaces. They are engineered for burning solid fuel - wood, wood briquettes class B ..
€ 2,881.50
Ex Tax:€ 2,342.68
Wood Boiler for Central Heating BURNiT NWB PRIME 20, 20kW - BURNiT Wood Boiler for Central Heating BURNiT NWB PRIME 20, 20kW - BURNiT
Last item in stock FREE DELIVERY
Brand: BURNiT Model: 0000000020
Steel boiler with intelligent electronic controller and electric fan for forced air feed. Solid fuel boilers NWB PRIME range in nominal output from 20 to 110 kW to satisfy the heating demands of medium to large sized spaces. They are engineered for burning solid fuel - wood, wood briquettes class B ..
€ 2,662.80
Ex Tax:€ 2,164.88
Wood Boiler for Central Heating BURNiT NWB MAX 55, 55kW - BURNiT Wood Boiler for Central Heating BURNiT NWB MAX 55, 55kW - BURNiT
Last item in stock FREE DELIVERY
Brand: BURNiT Model: 0000000071
Steel boiler with natural air feed, controlled by a thermostatic draught regulator. Solid fuel boilers NWB MAX range in nominal output from 20 to 110 kW to satisfy the heating demands of medium to large sized spaces. They are engineered for burning solid fuel - wood, wood briquettes class B and coal..
€ 2,876.38
Ex Tax:€ 2,338.52
Pellet set BURNiT WBS AC Pellet 60 Active 90 - Pell 70, 65kW - BURNiT Pellet set BURNiT WBS AC Pellet 60 Active 90 - Pell 70, 65kW - BURNiT
FREE DELIVERY
Brand: BURNiT Model: 0000002656
Set of steel boiler WBS with pre-mounted pellet burner and fuel feeder. Range in nominal output from 20 to 90 kW to satisfy the heating demands of medium to large sized spaces by using the environmentally friendly fuel wood pellets. The WBS Active boiler is adapted for pellet burning, and together w..
€ 5,948.43
Ex Tax:€ 4,836.12
Pellet set BURNiT WBS AC Pellet 50 Active 70 - Pell 70, 65kW - BURNiT Pellet set BURNiT WBS AC Pellet 50 Active 70 - Pell 70, 65kW - BURNiT
FREE DELIVERY
Brand: BURNiT Model: 0000002655
Set of steel boiler WBS with pre-mounted pellet burner and fuel feeder. Range in nominal output from 20 to 90 kW to satisfy the heating demands of medium to large sized spaces by using the environmentally friendly fuel wood pellets. The WBS Active boiler is adapted for pellet burning, and together w..
€ 5,386.32
Ex Tax:€ 4,379.12
Pellet set BURNiT WBS AC Pellet 35 Active 50 - Pell 40, 40kW - BURNiT Pellet set BURNiT WBS AC Pellet 35 Active 50 - Pell 40, 40kW - BURNiT
FREE DELIVERY
Brand: BURNiT Model: 0000002654
Set of steel boiler WBS with pre-mounted pellet burner and fuel feeder. Range in nominal output from 20 to 90 kW to satisfy the heating demands of medium to large sized spaces by using the environmentally friendly fuel wood pellets. The WBS Active boiler is adapted for pellet burning, and together w..
€ 4,866.94
Ex Tax:€ 3,956.86
Pellet set BURNiT WBS AC Pellet 25 Active 40 - Pell 30, 32kW - BURNiT Pellet set BURNiT WBS AC Pellet 25 Active 40 - Pell 30, 32kW - BURNiT
FREE DELIVERY
Brand: BURNiT Model: 0000002653
Set of steel boiler WBS with pre-mounted pellet burner and fuel feeder. Range in nominal output from 20 to 90 kW to satisfy the heating demands of medium to large sized spaces by using the environmentally friendly fuel wood pellets. The WBS Active boiler is adapted for pellet burning, and together w..
€ 4,294.23
Ex Tax:€ 3,491.24
Pellet set BURNiT WBS AC Pellet 20 Active 30 - Pell 30, 27kW - BURNiT Pellet set BURNiT WBS AC Pellet 20 Active 30 - Pell 30, 27kW - BURNiT
FREE DELIVERY
Brand: BURNiT Model: 0000002652
Set of steel boiler WBS with pre-mounted pellet burner and fuel feeder. Range in nominal output from 20 to 90 kW to satisfy the heating demands of medium to large sized spaces by using the environmentally friendly fuel wood pellets. The WBS Active boiler is adapted for pellet burning, and together w..
€ 4,119.59
Ex Tax:€ 3,349.26
Wood Boiler for Central Heating BURNiT NWB PRIME 40, 40kW - BURNiT Wood Boiler for Central Heating BURNiT NWB PRIME 40, 40kW - BURNiT
Last item in stock FREE DELIVERY
Brand: BURNiT Model: 0000000046
Steel boiler with intelligent electronic controller and electric fan for forced air feed. Solid fuel boilers NWB PRIME range in nominal output from 20 to 110 kW to satisfy the heating demands of medium to large sized spaces. They are engineered for burning solid fuel - wood, wood briquettes class B ..
€ 3,418.39
Ex Tax:€ 2,779.18
Brand: BURNiT Model: 0000013740
Infrared sensor used for detecting flame intensity in a pellet burner.Original spare part for pellet burner BURNiT Pell...
€ 40.58
Ex Tax:€ 32.99
Brand: BURNiT Model: 0000013741
Infrared sensor used for detecting flame intensity in a pellet burner.Original spare part for pellet burner BURNiT Pell...
€ 43.28
Ex Tax:€ 35.19
Pellet feed auger for BURNiT Pell pellet burner Pell - BURNiT Pellet feed auger for BURNiT Pell pellet burner Pell - BURNiT
FREE DELIVERY
Brand: BURNiT Model: 0000013924
Pellet feed auger for BURNiT Pell pellet burner Pell 70
Pellet feed auger for BURNiT Pell pellet burner Pell
Pellet feed auger for BURNiT Pell pellet burner Pell 150
The feed auger transports the fuel (pellets) from the hopper to the burner...
€ 304.18
Ex Tax:€ 247.30
Pellet burner igniter for Burnit Pell, 325 W - x3 - BURNiT Pellet burner igniter for Burnit Pell, 325 W - x3 - BURNiT
FREE DELIVERY
Brand: BURNiT Model: 15.456.001-3PCS
Pellet burner igniter for Burnit Pell, 325 W - x3 (3 x Pellet burner igniter for Burnit Pell, 325 W)Igniter / Resistance with flange for the ignition and burning. Suitable for Burnit Pell pellet burners...
€ 123.71
Ex Tax:€ 100.58
Brand: BURNiT Model: 15.456.001-2PCS
Pellet burner igniter for Burnit Pell, 325 W - x2 (2 x Pellet burner igniter for Burnit Pell, 325 W)Igniter / Resistance with flange for the ignition and burning. Suitable for Burnit Pell pellet burners...
€ 86.57
Ex Tax:€ 70.38
Brand: BURNiT Model: 0000006658
Igniter / Resistance with flange for the ignition and burning. Suitable for Burnit Pell pellet burners...
€ 69.94
Ex Tax:€ 56.86
Pellet Burner Igniter for BURNiT Pell Eco, 320 W - x3 - BURNiT
FREE DELIVERY
Brand: BURNiT Model: 15.456.004-3PCS
Pellet Burner Igniter for BURNiT Pell Eco, 320 W - x3 (3 x Pellet Burner Igniter for BURNiT Pell Eco, 320 W)Igniter for pellet burners with flange for the ignition and burning. Suitable for Burnit Pell Eco pellet burners...
€ 123.71
Ex Tax:€ 100.58
Brand: BURNiT Model: 15.456.004-2PCS
Pellet Burner Igniter for BURNiT Pell Eco, 320 W - x2 (2 x Pellet Burner Igniter for BURNiT Pell Eco, 320 W)Igniter for pellet burners with flange for the ignition and burning. Suitable for Burnit Pell Eco pellet burners...
€ 86.57
Ex Tax:€ 70.38
Brand: BURNiT Model: 15.456.004
Igniter for pellet burners with flange for the ignition and burning. Suitable for Burnit Pell Eco pellet burners...
€ 43.28
Ex Tax:€ 35.19
Pellet Burner BURNiT Pell Eco 35, 5-35kW - BURNiT Pellet Burner BURNiT Pell Eco 35, 5-35kW - BURNiT
Last items in stock FREE DELIVERY
Brand: BURNiT Model: 0000008040
The BURNiT Pell Eco is a pellet burner for heating boilers. It burns wood-pellets with diameter 6-8 mm. It ensures an efficient and low-emission combustion. Produced of high-grade stainless steel, it withstands temperatures up to 1150°C. The built-in CPU-controlled unit manages the burner operation ..
€ 1,912.65
Ex Tax:€ 1,555.00
Brand: BURNiT Model: 0007743351
Flame sensor for BURNiT Pell
Igniter / Heating element for pellet stoves La Nordica and others, total length 155mm, 300W
Infrared sensor used for detecting flame intensity in a pellet burner.Original spare part for pellet burner BURNiT Pell...
€ 59.04
Ex Tax:€ 48.00
Burning Chamber for Sunsystem pellet burner BURNiT Model Pell - BURNiT Burning Chamber for Sunsystem pellet burner BURNiT Model Pell - BURNiT
FREE DELIVERY
Brand: BURNiT Model: 0000006556
Burning Chamber for Sunsystem pellet burner BURNiT Model Pell
Burning Chamber for Sunsystem pellet burner BURNiT Model Pell 30
Burning Chamber for Sunsystem pellet burner BURNiT Model Pell 40
Burning Chamber for Sunsystem pellet burner BURNiT Model Pell 90
Burning Chamber for Sunsystem pellet burner BURNiT Model Pell 70
Burning Chamber for Sunsystem pellet burner BURNiT Models Pell...
€ 233.70
Ex Tax:€ 190.00
Showing 1 to 23 of 23 (1 Pages)

BURNiT is a Bulgarian brand that offers a wide variety of pellet stoves and burners, different types of boilers - pellets, wood or combined, boilers for domestic or industrial needs, buffer vessels and solar panels. BURNiT offers products of European quality at very good prices. In addition to the wide variety of different functionalities and designs, BURNiT brand products successfully complement the interior of any room. The BURNiT brand offers highly efficient and environmentally friendly products that are reliable, safe and meet all European operating standards. The high energy class of BURNiT pellet equipment is covered by the highest German and Austrian standards for quality and efficiency BAFA and BImSchV2. BURNiT boilers have a certificate that meets the requirements of the European directive on energy efficiency EcoDesign.

BURNiT pellet burners

from the Pell series are equipped with automated ignition and modern microprocessor control, which guarantees convenience and trouble-free operation. BURNiT pellet burners are equipped with temperature sensors, a photo sensor for flame power, and the various models have the ability to control the chimney fan. BURNiT pellet burners are made of high quality stainless steel and can withstand temperatures up to 1150 ° C. They have a dry non-contact heater, a combustion chamber cleaning system and are available in different capacities. BURNiT pellet burners provide highly efficient, optimal fuel combustion and an environmentally friendly combustion process.

BURNiT pellet stoves

are beautiful, reliable and fully automated. All BURNiT pellet stoves have a built-in pellet hopper and have automatic fuel supply to the combustion chamber, and the electronics control all combustion processes, including ventilation. A special Wi-Fi controller allows control and management via the Internet. Available in several series - VISION, COMFORT, CALOR, AMBIENT, TREND and ADVANT. Back boiler equipment allows their use in systems with radiators or underfloor heating. Each of the BURNiT series of stoves is available in several power variants - 13, 18 and 25 kW.

  • BURNiT Vision stoves have a back boiler, all-glass door and modern design.
  • BURNiT Advant stoves also have a water jacket and a traditional design in a classic or retro style.
  • BURNiT Comfort stoves are simple and reliable, equipped with a back boiler and suitable for any design. The BURNiT ComfortB2 modification is made without glass, but has additional insulation of the back boiler and can be used as a mini boiler even on the balcony.

BURNiT Ambient series stoves are cheap and have air circulation. Equipped with fans and installed air ducts, they are without a back boiler. They are extremely easy to install and are ideal for heating several separate rooms.

BURNiT stoves with back boiler have a built-in circulation pump and an expansion vessel. They are easy to install and operate. They are compact and with an elegant design that adds comfort, style and coziness to any room.

BURNiT pellet and combined boilers

are available in different models and are easy and convenient to operate. Their construction is sufficiently stable and reliable and is characterized by very low operating costs. They can be installed alone or in combination with another heating device. If domestic hot water is required, the BURNiT boiler can be connected to a boiler with heat exchanger.

Combined water heaters BURNiT

are preferred for the production and storage of hot water for domestic use and heating. Different models allow connection to several external and one internal electric heat source. They have a buffer that feeds the heating system, and the total capacity is up to 1500 liters.

In addition to its rich portfolio of BURNiT products, the company finances and supports a number of amateur and professional sports clubs. BURNiT sponsors the Bulgarian national biathlon team, as well as championships in karate, wrestling, judo, orienteering and more.

Pellet burners

Pellet stoves

Pellet boilers

Combined water heaters