Menu
Your Cart

Wood Boiler for Central Heating BURNiT WBS Magna 250, 250kW

Wood stove furnace BURNiT WBS Magna 250, 250kW | Wood Stove Furnaces |  |
Wood stove furnace BURNiT WBS Magna 250, 250kW | Wood Stove Furnaces |  |
FREE DELIVERY FREE DELIVERY Out of stock
Wood stove furnace BURNiT WBS Magna 250, 250kW | Wood Stove Furnaces |  |
Wood stove furnace BURNiT WBS Magna 250, 250kW | Wood Stove Furnaces |  |

Do you need chimney?

Wood Boiler for Central Heating BURNiT WBS Magna 250, 250kW

Solid fuel boiler Burnit WBS Magna 250 for central heating of large premises up to 2500m². Constructed for solid fuel burning - wood, wood briquettes class B and coal.

  • Stock: Out of stock
  • Brand: BURNiT
  • SKU: 08.438.032
€ 8,890.43
incl. VAT
Ex Tax: € 7,408.69

    Save 2%   with bank transfer.

Estimated delivery
16.Mar.2026
DHL Schenker Dachser
See Shipping Policy

365 DAY RETURN
​365 daysSee details

SECURE PAYMENTS
    See details

Steel Solid fuel boilers satisfy the heating demands of large sized spaces. Owing to its smart design, WBS Magna 250 is easy to transport and install in spite of its dimensions. The boiler can be connected to either closed or open loop heating system. The construction allows for fitting with pellet-, oil- or gas-fired burners.
Compliant with norm EN 303-5, class III.

Manufacture

The boiler body is Manufactured from high quality steel. The combustion chamber has a large heat exchanging surface and low chamber impedance. Large firebox door ensures easy loading even of large wood logs (up to 100cm long). The loading door also has a combustion viewer for monitoring the burning process. With a maximum operating pressure of 4 bar BURNiT WBS Magna is capable to feed a large-scale heating system. Convenient inspection door in the upper part of the boiler ensures easy cleaning of the flue exhaust tubes. 

Effectiveness

To increase the heat exchange, the combustion chamber is designed for a three-pass flue gas flow. The mantle completely envelops the firebox for maximized usage of the heat, and has the exhaust gas tubes immersed into it for even higher heat exchanging surface. The boiler's body is insulated from the external conditions by thick high temperature resisting wool. The model uses a thermostatic draught regulator that opens or closes a flap on the lower door, depending on the amount of air needed for the burning process. The casing and insulation of the boiler can be removed for transport or maintenance.

Safety devices

For a safe and reliable operation of the boiler, a number of safety devices are installed

- Thermostatic draught regulator;

- Pressure relief valve 4bar (not included);

- Chimney draught flap;

- Thermostatic draught regulator;

- Thermometer.

- Safety heat evacuator: a tap-water filled line passes through the uppermost part of the boiler body. In case of overheating it is triggered open by a thermostatic valve (not included) to evacuate the heat off the boiler.

Fuel

The central heating boiler can operate with natural untreated wood, but also with coal and compressed solid fuel such as briquettes. Maximum length of the wood logs is 1000mm. Fuel moisture should be 20% or lower.

In order to use the maximum caloricity of the fuel, the wood logs should be dried for a prolonged period of time. High moisture levels reduces caloricity and the output power of the boiler.

Versatility

This series of boilers is manufactured for burning solid fuel, with the option of adaptation to a different kind of fuel. This is possible by mounting a pellet, gas or an oil burner on the lower door opening. A flange is also needed to mount the burner (optional).

Schematic of the main features of a WBS Magna wood boiler

Wbs Magna schematic

 

Legend:

1. Hot water outlet
2. Safety line 
3. Housing
4. High efficiency thermal insulation
5. Fume exhaust tube
6. Water mantle (jacket)
7. Three-pass flue gas flow
8. Combustion chamber
9. Metal grate
10. Transportation openings
11. Air intake door
12. Burner flange (option)
13. Loading door
14. Inspection door
15. Cold water inlet

Characteristics
Weight (kg) 1530.0000
Country of Manufacture Bulgaria
Dimension Depth (mm) 1950
Dimension Width (mm) 950
Dimension Height (mm) 2100
Warranty 2 Years
Certification CE
Approximate heating surface (m²) 2500
Mantle volume (L) 790
Insulation boiler Thermal wool insulation
Flue (mm) 300
Required chimney draught (Pa/mbar) 42/ 0.42
Exhaust Location Back side
Control panel No
Combustion forced ventilation No
Nominal heat output (kW) 250
Automatic cleaning system No
Approximate heating capacity (m³) 6000
Construction material Steel
Temperature indicator Yes
Insulation doors Thermal wool insulation
Exhaust gas temperature (operation mode), °C 150 - 180
Combustion chamber impedance (Pa/mbar) 23 / 0.23
Thermostatic draught regulator Yes